Aug. 27, 2025
FutureTech Featuring ETC - Centralizing LED Lighting with the F-Drive RX

This episode explores ETC’s newly launched F-Drive RX, a centralized, low-voltage LED driver that promises to revolutionize lighting design and maintenance. Chris and Lacy break down its key features, compatibility, and the game-changing impact it could have for installers and venues
1
00:00:19,560 --> 00:00:23,640
Welcome back to Geezers of Gear
Future Tech I'm Chris, and as
2
00:00:23,640 --> 00:00:25,240
always, I've got Lacey here with
me.
3
00:00:25,480 --> 00:00:29,560
Today we're diving into ETC's
latest bit of kit, the F Drive
4
00:00:29,560 --> 00:00:32,680
RX, and why it's stirring things
up in the lighting world.
5
00:00:33,120 --> 00:00:36,480
So, Laci, you've seen all sorts
of wild installs over the years.
6
00:00:36,880 --> 00:00:39,000
What did you make of this when
you first heard about it?
7
00:00:39,560 --> 00:00:42,360
Honestly, Chris, when you first
mentioned a rack mountable LED
8
00:00:42,440 --> 00:00:46,440
driver, my brain went straight
to that sounds, well,
9
00:00:46,560 --> 00:00:50,240
intimidating.
But after looking into it, it's
10
00:00:50,240 --> 00:00:53,160
not intimidating at all.
This thing's all about keeping
11
00:00:53,160 --> 00:00:56,280
it central.
You stick the F drive RX in your
12
00:00:56,280 --> 00:00:59,800
rack and suddenly you've got
control over basically any LED
13
00:00:59,800 --> 00:01:02,080
you want, and it all runs on
CAT6.
14
00:01:02,480 --> 00:01:04,400
That's wild, right?
Exactly.
15
00:01:04,400 --> 00:01:07,680
The days of crawling around old
ceilings searching for dodgy
16
00:01:07,680 --> 00:01:09,840
little drivers buried above
plasterboard.
17
00:01:10,360 --> 00:01:14,200
They could be over.
I remember this was, oh, ten
18
00:01:14,200 --> 00:01:16,640
years ago now.
I had to squeeze into a crawl
19
00:01:16,640 --> 00:01:21,040
space, proper Mission Impossible
style in this historic theater
20
00:01:21,960 --> 00:01:26,320
just to replace 1 failed driver.
It took hours and believe me,
21
00:01:26,320 --> 00:01:28,280
nobody looked dignified in the
process.
22
00:01:28,720 --> 00:01:31,480
With the F drive RX, all your
guts are in the rack.
23
00:01:31,880 --> 00:01:35,480
You drive constant current,
constant voltage, and novice
24
00:01:35,480 --> 00:01:39,120
fixtures up to 2800 watts all
through output cards that just
25
00:01:39,120 --> 00:01:42,440
slot in it's.
I mean, it's almost too easy.
26
00:01:43,040 --> 00:01:46,120
What blows my mind is it's not
just for fancy Navi stuff.
27
00:01:46,600 --> 00:01:49,440
If I'm reading the docs right,
you can run everything from high
28
00:01:49,440 --> 00:01:52,400
end architectural down to humble
LED tape.
29
00:01:52,440 --> 00:01:55,080
Right you are.
Mix and match.
30
00:01:55,600 --> 00:01:58,840
If you've got those lovely ETC
luminaires, perfect.
31
00:01:59,440 --> 00:02:02,160
But if your designer went on a
wild shopping spree, inspect a
32
00:02:02,160 --> 00:02:07,240
dozen types, you're still sorted
all from one rack and no high
33
00:02:07,240 --> 00:02:08,800
voltage lines threading the
space.
34
00:02:09,039 --> 00:02:12,640
So places with tight install
rules, schools, old buildings,
35
00:02:12,640 --> 00:02:15,640
cruise ships, they can get
creative without an electrician
36
00:02:15,640 --> 00:02:19,280
on speed dial or chasing random
drivers up in the ceiling tiles.
37
00:02:19,960 --> 00:02:23,000
That's a huge bonus.
And the form factor is sort of
38
00:02:23,000 --> 00:02:26,040
elegant too, right?
Just A2U enclosure for the
39
00:02:26,040 --> 00:02:30,160
driver, one U for the power.
Doesn't eat up much rack space.
40
00:02:30,680 --> 00:02:32,320
My old AV techs would have loved
that.
41
00:02:32,800 --> 00:02:35,920
Yeah, it's neat and tidy, and it
feels like an evolution from
42
00:02:35,920 --> 00:02:39,120
what we've talked about before
with, say, the site link or the
43
00:02:39,120 --> 00:02:41,240
rig POV.
Putting all the brains where you
44
00:02:41,240 --> 00:02:44,440
can actually get to them instead
of sending folks spelunking
45
00:02:44,440 --> 00:02:48,120
behind walls or rigging simple,
clever stuff.
46
00:02:48,400 --> 00:02:51,960
So jumping off that, the
installation side is what I'm
47
00:02:51,960 --> 00:02:54,960
really curious about.
I mean, CAT6 is everywhere these
48
00:02:54,960 --> 00:02:58,240
days in conferences, ships,
retail, you name it.
49
00:02:58,920 --> 00:03:02,640
So basically you just snake
these cables out and plug right
50
00:03:02,640 --> 00:03:05,720
into your fixtures.
No high voltage conduit or like
51
00:03:05,720 --> 00:03:07,800
those endless lockout tag out
worksheets.
52
00:03:08,360 --> 00:03:10,360
Exactly.
All the power and control
53
00:03:10,360 --> 00:03:13,120
protocol goes down.
Standard CAT6 since we're
54
00:03:13,120 --> 00:03:16,320
talking low voltage.
No more wrestling with conduit,
55
00:03:16,600 --> 00:03:20,160
bent knuckles, or fiddly high
voltage sign offs and
56
00:03:20,160 --> 00:03:21,960
maintenance.
Piece of cake.
57
00:03:22,440 --> 00:03:24,600
Let's say a channel's acting up
on an output card.
58
00:03:25,000 --> 00:03:28,000
Anyone trained up, even a
facilities tech, can swap that
59
00:03:28,000 --> 00:03:30,320
card hot.
You don't need an electrician
60
00:03:30,320 --> 00:03:33,760
just to keep your lights on.
It's safe to work on even during
61
00:03:33,760 --> 00:03:36,080
open hours.
If you can terminate a network
62
00:03:36,080 --> 00:03:38,160
cable, you're basically halfway
there.
63
00:03:38,800 --> 00:03:41,920
That is such a game changer for
big hotels or venues with lots
64
00:03:41,920 --> 00:03:44,960
of events stacked up or even oh
let me tell you about this one
65
00:03:44,960 --> 00:03:47,200
show.
We had a ballroom full of
66
00:03:47,200 --> 00:03:50,240
corporate types and someone
decided at 10 in the morning
67
00:03:50,320 --> 00:03:52,880
that they wanted all the ceiling
fixtures swapped out.
68
00:03:53,560 --> 00:03:57,320
We spent hours waiting on sign
offs and electricians and
69
00:03:57,320 --> 00:04:00,680
honestly my team missed lunch
because we were running around
70
00:04:00,680 --> 00:04:03,680
like maniacs.
If it had been centralized like
71
00:04:03,680 --> 00:04:06,400
this with everything.
Rack mount, modular, hot
72
00:04:06,400 --> 00:04:09,400
swappable, would have been done
in an hour, probably less.
73
00:04:09,520 --> 00:04:12,360
No drama, no downtime.
I can just picture you
74
00:04:12,360 --> 00:04:14,640
corralling the texts.
Don't break anything.
75
00:04:14,640 --> 00:04:18,200
Expensive, but yeah, it's the
way of the future, right?
76
00:04:18,720 --> 00:04:21,959
I suppose a building's existing
cable trays could just be used,
77
00:04:22,360 --> 00:04:25,160
and because it's low voltage
you're not as boxed in by the
78
00:04:25,160 --> 00:04:27,720
local codes.
Maintenance can finally be
79
00:04:27,720 --> 00:04:30,960
handled properly by the in house
team, not just brought in
80
00:04:30,960 --> 00:04:33,000
specialists.
And that keeps everything
81
00:04:33,000 --> 00:04:35,800
humming along, even if you're
halfway through a trade show or
82
00:04:35,800 --> 00:04:39,320
conference week.
And for cruise ships or those
83
00:04:39,320 --> 00:04:42,600
all day conference centers where
their schedules leave 0 room for
84
00:04:42,600 --> 00:04:46,920
downtime, this seems kind of, I
don't know, necessary?
85
00:04:47,480 --> 00:04:51,080
Not just a nice to have anymore.
Feels like a whole chunk of
86
00:04:51,080 --> 00:04:55,000
install hassle just falls away.
Which I love because everyone's
87
00:04:55,000 --> 00:04:57,720
got better things to do than
chase a burnt out LED behind an
88
00:04:57,800 --> 00:05:00,520
AV wall at 2:00 AM.
Couldn't agree more.
89
00:05:00,960 --> 00:05:03,600
From a maintenance perspective,
it's night and day.
90
00:05:04,080 --> 00:05:05,520
And it's not just about
convenience.
91
00:05:05,760 --> 00:05:08,080
It's safer.
Nobody's hunting for hidden
92
00:05:08,080 --> 00:05:11,600
power supplies, nobody's
tripping Breakers or shutting
93
00:05:11,600 --> 00:05:13,640
down the whole rig for a quick
card swap.
94
00:05:14,160 --> 00:05:16,840
Now here's where it ramps up
versatility.
95
00:05:17,360 --> 00:05:19,200
The F drive RX isn't picky, is
it?
96
00:05:19,600 --> 00:05:23,320
You've got constant current
cards, constant voltage fade to
97
00:05:23,320 --> 00:05:25,960
warm, and soon there'll be
chroma cards for even more
98
00:05:25,960 --> 00:05:28,240
tricks.
That means anything from Etc's
99
00:05:28,240 --> 00:05:30,920
range, but also most third party
LEDs.
100
00:05:31,360 --> 00:05:34,800
And those output cards are all
hot swappable. 1 box covers
101
00:05:34,800 --> 00:05:37,920
pretty much the lot.
And the emergency stuff really
102
00:05:37,920 --> 00:05:39,400
makes it a serious central
brain.
103
00:05:39,760 --> 00:05:43,640
Because it's UL 924 listed, you
can hook it into emergency
104
00:05:43,640 --> 00:05:45,960
lighting right?
If the building needs load
105
00:05:45,960 --> 00:05:49,360
shedding or auto switchover
during a power blip, you don't
106
00:05:49,360 --> 00:05:51,640
have to try to do that
complicated hack of keeping a
107
00:05:51,640 --> 00:05:53,840
couple LEDs on and turning
others off.
108
00:05:54,440 --> 00:05:56,640
It just does it safely and
cleanly.
109
00:05:57,240 --> 00:05:59,560
Exactly.
You can support emergency looks
110
00:05:59,560 --> 00:06:03,440
so it becomes part of a coherent
emergency design instead of an
111
00:06:03,440 --> 00:06:06,040
afterthought.
And with load shedding built in,
112
00:06:06,280 --> 00:06:09,640
you're compliant with codes,
you're safe, and you get Peace
113
00:06:09,640 --> 00:06:11,560
of Mind.
That's especially critical in
114
00:06:11,560 --> 00:06:15,120
places like schools or retail.
But to me, the creative
115
00:06:15,120 --> 00:06:18,120
flexibility is almost more
interesting when you aren't
116
00:06:18,120 --> 00:06:21,440
saddled with whatever driver you
can fit behind the drywall.
117
00:06:21,800 --> 00:06:24,640
Suddenly a whole world of
fixture options opens up.
118
00:06:25,120 --> 00:06:28,560
More colours, better dimming.
Your imagination actually gets
119
00:06:28,560 --> 00:06:31,360
to go wild.
I'm just thinking this gives so
120
00:06:31,360 --> 00:06:34,160
much more control to design
teams, especially those on a
121
00:06:34,160 --> 00:06:36,880
budget or without a dedicated
lighting expert on site.
122
00:06:37,720 --> 00:06:40,480
I mean, maybe your facilities
crew isn't up for redoing high
123
00:06:40,480 --> 00:06:45,800
voltage, but CAT6 that's doable.
You're not blocked by a lack of
124
00:06:45,800 --> 00:06:48,040
specialists or dealing with
restrictive tech behind the
125
00:06:48,040 --> 00:06:50,840
scenes.
Spot on, and for environments
126
00:06:50,840 --> 00:06:53,720
where installs have to last,
like themed environments or
127
00:06:53,720 --> 00:06:56,480
education spaces, it's future
proof too.
128
00:06:56,880 --> 00:06:58,480
You want to add new fixtures
next year?
129
00:06:59,000 --> 00:07:02,000
Maybe some crazy chroma stuff.
When it's out, just slot in a
130
00:07:02,000 --> 00:07:04,600
new card and go.
It's that simple.
131
00:07:05,200 --> 00:07:08,400
There's a bit of a debate in the
industry I know about losing the
132
00:07:08,400 --> 00:07:12,000
arts of the weird workaround,
but honestly I'd rather see
133
00:07:12,000 --> 00:07:15,680
folks focusing on design, not
duct tape solutions to ancient
134
00:07:15,680 --> 00:07:18,000
infrastructure.
Amen to that.
135
00:07:18,800 --> 00:07:22,040
Well, Chris, I think it's safe
to say the F Drive RX isn't just
136
00:07:22,040 --> 00:07:24,920
another box in the rack.
It's a bit of a rethink for how
137
00:07:24,920 --> 00:07:28,600
we approach LED installs,
particularly for teams that
138
00:07:28,600 --> 00:07:30,880
don't want to be up on a ladder
all day or locked in a
139
00:07:30,880 --> 00:07:33,920
maintenance closet.
Yeah, it's proper smart stuff,
140
00:07:34,440 --> 00:07:37,320
and if this is where ET CS
headed, I reckon we'll see other
141
00:07:37,320 --> 00:07:38,880
manufacturers trying to catch
up.
142
00:07:39,560 --> 00:07:43,360
But hey, we'll cover more future
proof gear and stories, good and
143
00:07:43,360 --> 00:07:47,560
bad, in our next episode.
Lacey, always a pleasure diving
144
00:07:47,560 --> 00:07:50,000
in with you.
Same, Chris, thanks for keeping
145
00:07:50,000 --> 00:07:53,200
me honest on the tech terms and
thanks to everyone tuning in.
146
00:07:53,200 --> 00:07:55,600
Catch us next time on Geezers of
Gear Future Tech.
147
00:07:56,080 --> 00:07:59,600
Cheers everyone, take care and
keep the gear in the rack, not
148
00:07:59,600 --> 00:08:01,480
in the ceiling.
See you next episode.
149
00:08:02,640 --> 00:08:09,840
Want to scoop on gear?
Future Tech is here.
150
00:08:10,280 --> 00:08:14,800
Come on, then.
We make the specs so clear.
151
00:08:15,240 --> 00:08:20,200
Oh La La with music to your
ears.
152
00:08:20,400 --> 00:08:22,280
Hey, hey, hey.
Let's go.
153
00:08:22,640 --> 00:08:29,000
New gear vibes, new tech jive
gear hits unite.
154
00:08:29,960 --> 00:08:31,680
We keep it live.
00:00:19,560 --> 00:00:23,640
Welcome back to Geezers of Gear
Future Tech I'm Chris, and as
2
00:00:23,640 --> 00:00:25,240
always, I've got Lacey here with
me.
3
00:00:25,480 --> 00:00:29,560
Today we're diving into ETC's
latest bit of kit, the F Drive
4
00:00:29,560 --> 00:00:32,680
RX, and why it's stirring things
up in the lighting world.
5
00:00:33,120 --> 00:00:36,480
So, Laci, you've seen all sorts
of wild installs over the years.
6
00:00:36,880 --> 00:00:39,000
What did you make of this when
you first heard about it?
7
00:00:39,560 --> 00:00:42,360
Honestly, Chris, when you first
mentioned a rack mountable LED
8
00:00:42,440 --> 00:00:46,440
driver, my brain went straight
to that sounds, well,
9
00:00:46,560 --> 00:00:50,240
intimidating.
But after looking into it, it's
10
00:00:50,240 --> 00:00:53,160
not intimidating at all.
This thing's all about keeping
11
00:00:53,160 --> 00:00:56,280
it central.
You stick the F drive RX in your
12
00:00:56,280 --> 00:00:59,800
rack and suddenly you've got
control over basically any LED
13
00:00:59,800 --> 00:01:02,080
you want, and it all runs on
CAT6.
14
00:01:02,480 --> 00:01:04,400
That's wild, right?
Exactly.
15
00:01:04,400 --> 00:01:07,680
The days of crawling around old
ceilings searching for dodgy
16
00:01:07,680 --> 00:01:09,840
little drivers buried above
plasterboard.
17
00:01:10,360 --> 00:01:14,200
They could be over.
I remember this was, oh, ten
18
00:01:14,200 --> 00:01:16,640
years ago now.
I had to squeeze into a crawl
19
00:01:16,640 --> 00:01:21,040
space, proper Mission Impossible
style in this historic theater
20
00:01:21,960 --> 00:01:26,320
just to replace 1 failed driver.
It took hours and believe me,
21
00:01:26,320 --> 00:01:28,280
nobody looked dignified in the
process.
22
00:01:28,720 --> 00:01:31,480
With the F drive RX, all your
guts are in the rack.
23
00:01:31,880 --> 00:01:35,480
You drive constant current,
constant voltage, and novice
24
00:01:35,480 --> 00:01:39,120
fixtures up to 2800 watts all
through output cards that just
25
00:01:39,120 --> 00:01:42,440
slot in it's.
I mean, it's almost too easy.
26
00:01:43,040 --> 00:01:46,120
What blows my mind is it's not
just for fancy Navi stuff.
27
00:01:46,600 --> 00:01:49,440
If I'm reading the docs right,
you can run everything from high
28
00:01:49,440 --> 00:01:52,400
end architectural down to humble
LED tape.
29
00:01:52,440 --> 00:01:55,080
Right you are.
Mix and match.
30
00:01:55,600 --> 00:01:58,840
If you've got those lovely ETC
luminaires, perfect.
31
00:01:59,440 --> 00:02:02,160
But if your designer went on a
wild shopping spree, inspect a
32
00:02:02,160 --> 00:02:07,240
dozen types, you're still sorted
all from one rack and no high
33
00:02:07,240 --> 00:02:08,800
voltage lines threading the
space.
34
00:02:09,039 --> 00:02:12,640
So places with tight install
rules, schools, old buildings,
35
00:02:12,640 --> 00:02:15,640
cruise ships, they can get
creative without an electrician
36
00:02:15,640 --> 00:02:19,280
on speed dial or chasing random
drivers up in the ceiling tiles.
37
00:02:19,960 --> 00:02:23,000
That's a huge bonus.
And the form factor is sort of
38
00:02:23,000 --> 00:02:26,040
elegant too, right?
Just A2U enclosure for the
39
00:02:26,040 --> 00:02:30,160
driver, one U for the power.
Doesn't eat up much rack space.
40
00:02:30,680 --> 00:02:32,320
My old AV techs would have loved
that.
41
00:02:32,800 --> 00:02:35,920
Yeah, it's neat and tidy, and it
feels like an evolution from
42
00:02:35,920 --> 00:02:39,120
what we've talked about before
with, say, the site link or the
43
00:02:39,120 --> 00:02:41,240
rig POV.
Putting all the brains where you
44
00:02:41,240 --> 00:02:44,440
can actually get to them instead
of sending folks spelunking
45
00:02:44,440 --> 00:02:48,120
behind walls or rigging simple,
clever stuff.
46
00:02:48,400 --> 00:02:51,960
So jumping off that, the
installation side is what I'm
47
00:02:51,960 --> 00:02:54,960
really curious about.
I mean, CAT6 is everywhere these
48
00:02:54,960 --> 00:02:58,240
days in conferences, ships,
retail, you name it.
49
00:02:58,920 --> 00:03:02,640
So basically you just snake
these cables out and plug right
50
00:03:02,640 --> 00:03:05,720
into your fixtures.
No high voltage conduit or like
51
00:03:05,720 --> 00:03:07,800
those endless lockout tag out
worksheets.
52
00:03:08,360 --> 00:03:10,360
Exactly.
All the power and control
53
00:03:10,360 --> 00:03:13,120
protocol goes down.
Standard CAT6 since we're
54
00:03:13,120 --> 00:03:16,320
talking low voltage.
No more wrestling with conduit,
55
00:03:16,600 --> 00:03:20,160
bent knuckles, or fiddly high
voltage sign offs and
56
00:03:20,160 --> 00:03:21,960
maintenance.
Piece of cake.
57
00:03:22,440 --> 00:03:24,600
Let's say a channel's acting up
on an output card.
58
00:03:25,000 --> 00:03:28,000
Anyone trained up, even a
facilities tech, can swap that
59
00:03:28,000 --> 00:03:30,320
card hot.
You don't need an electrician
60
00:03:30,320 --> 00:03:33,760
just to keep your lights on.
It's safe to work on even during
61
00:03:33,760 --> 00:03:36,080
open hours.
If you can terminate a network
62
00:03:36,080 --> 00:03:38,160
cable, you're basically halfway
there.
63
00:03:38,800 --> 00:03:41,920
That is such a game changer for
big hotels or venues with lots
64
00:03:41,920 --> 00:03:44,960
of events stacked up or even oh
let me tell you about this one
65
00:03:44,960 --> 00:03:47,200
show.
We had a ballroom full of
66
00:03:47,200 --> 00:03:50,240
corporate types and someone
decided at 10 in the morning
67
00:03:50,320 --> 00:03:52,880
that they wanted all the ceiling
fixtures swapped out.
68
00:03:53,560 --> 00:03:57,320
We spent hours waiting on sign
offs and electricians and
69
00:03:57,320 --> 00:04:00,680
honestly my team missed lunch
because we were running around
70
00:04:00,680 --> 00:04:03,680
like maniacs.
If it had been centralized like
71
00:04:03,680 --> 00:04:06,400
this with everything.
Rack mount, modular, hot
72
00:04:06,400 --> 00:04:09,400
swappable, would have been done
in an hour, probably less.
73
00:04:09,520 --> 00:04:12,360
No drama, no downtime.
I can just picture you
74
00:04:12,360 --> 00:04:14,640
corralling the texts.
Don't break anything.
75
00:04:14,640 --> 00:04:18,200
Expensive, but yeah, it's the
way of the future, right?
76
00:04:18,720 --> 00:04:21,959
I suppose a building's existing
cable trays could just be used,
77
00:04:22,360 --> 00:04:25,160
and because it's low voltage
you're not as boxed in by the
78
00:04:25,160 --> 00:04:27,720
local codes.
Maintenance can finally be
79
00:04:27,720 --> 00:04:30,960
handled properly by the in house
team, not just brought in
80
00:04:30,960 --> 00:04:33,000
specialists.
And that keeps everything
81
00:04:33,000 --> 00:04:35,800
humming along, even if you're
halfway through a trade show or
82
00:04:35,800 --> 00:04:39,320
conference week.
And for cruise ships or those
83
00:04:39,320 --> 00:04:42,600
all day conference centers where
their schedules leave 0 room for
84
00:04:42,600 --> 00:04:46,920
downtime, this seems kind of, I
don't know, necessary?
85
00:04:47,480 --> 00:04:51,080
Not just a nice to have anymore.
Feels like a whole chunk of
86
00:04:51,080 --> 00:04:55,000
install hassle just falls away.
Which I love because everyone's
87
00:04:55,000 --> 00:04:57,720
got better things to do than
chase a burnt out LED behind an
88
00:04:57,800 --> 00:05:00,520
AV wall at 2:00 AM.
Couldn't agree more.
89
00:05:00,960 --> 00:05:03,600
From a maintenance perspective,
it's night and day.
90
00:05:04,080 --> 00:05:05,520
And it's not just about
convenience.
91
00:05:05,760 --> 00:05:08,080
It's safer.
Nobody's hunting for hidden
92
00:05:08,080 --> 00:05:11,600
power supplies, nobody's
tripping Breakers or shutting
93
00:05:11,600 --> 00:05:13,640
down the whole rig for a quick
card swap.
94
00:05:14,160 --> 00:05:16,840
Now here's where it ramps up
versatility.
95
00:05:17,360 --> 00:05:19,200
The F drive RX isn't picky, is
it?
96
00:05:19,600 --> 00:05:23,320
You've got constant current
cards, constant voltage fade to
97
00:05:23,320 --> 00:05:25,960
warm, and soon there'll be
chroma cards for even more
98
00:05:25,960 --> 00:05:28,240
tricks.
That means anything from Etc's
99
00:05:28,240 --> 00:05:30,920
range, but also most third party
LEDs.
100
00:05:31,360 --> 00:05:34,800
And those output cards are all
hot swappable. 1 box covers
101
00:05:34,800 --> 00:05:37,920
pretty much the lot.
And the emergency stuff really
102
00:05:37,920 --> 00:05:39,400
makes it a serious central
brain.
103
00:05:39,760 --> 00:05:43,640
Because it's UL 924 listed, you
can hook it into emergency
104
00:05:43,640 --> 00:05:45,960
lighting right?
If the building needs load
105
00:05:45,960 --> 00:05:49,360
shedding or auto switchover
during a power blip, you don't
106
00:05:49,360 --> 00:05:51,640
have to try to do that
complicated hack of keeping a
107
00:05:51,640 --> 00:05:53,840
couple LEDs on and turning
others off.
108
00:05:54,440 --> 00:05:56,640
It just does it safely and
cleanly.
109
00:05:57,240 --> 00:05:59,560
Exactly.
You can support emergency looks
110
00:05:59,560 --> 00:06:03,440
so it becomes part of a coherent
emergency design instead of an
111
00:06:03,440 --> 00:06:06,040
afterthought.
And with load shedding built in,
112
00:06:06,280 --> 00:06:09,640
you're compliant with codes,
you're safe, and you get Peace
113
00:06:09,640 --> 00:06:11,560
of Mind.
That's especially critical in
114
00:06:11,560 --> 00:06:15,120
places like schools or retail.
But to me, the creative
115
00:06:15,120 --> 00:06:18,120
flexibility is almost more
interesting when you aren't
116
00:06:18,120 --> 00:06:21,440
saddled with whatever driver you
can fit behind the drywall.
117
00:06:21,800 --> 00:06:24,640
Suddenly a whole world of
fixture options opens up.
118
00:06:25,120 --> 00:06:28,560
More colours, better dimming.
Your imagination actually gets
119
00:06:28,560 --> 00:06:31,360
to go wild.
I'm just thinking this gives so
120
00:06:31,360 --> 00:06:34,160
much more control to design
teams, especially those on a
121
00:06:34,160 --> 00:06:36,880
budget or without a dedicated
lighting expert on site.
122
00:06:37,720 --> 00:06:40,480
I mean, maybe your facilities
crew isn't up for redoing high
123
00:06:40,480 --> 00:06:45,800
voltage, but CAT6 that's doable.
You're not blocked by a lack of
124
00:06:45,800 --> 00:06:48,040
specialists or dealing with
restrictive tech behind the
125
00:06:48,040 --> 00:06:50,840
scenes.
Spot on, and for environments
126
00:06:50,840 --> 00:06:53,720
where installs have to last,
like themed environments or
127
00:06:53,720 --> 00:06:56,480
education spaces, it's future
proof too.
128
00:06:56,880 --> 00:06:58,480
You want to add new fixtures
next year?
129
00:06:59,000 --> 00:07:02,000
Maybe some crazy chroma stuff.
When it's out, just slot in a
130
00:07:02,000 --> 00:07:04,600
new card and go.
It's that simple.
131
00:07:05,200 --> 00:07:08,400
There's a bit of a debate in the
industry I know about losing the
132
00:07:08,400 --> 00:07:12,000
arts of the weird workaround,
but honestly I'd rather see
133
00:07:12,000 --> 00:07:15,680
folks focusing on design, not
duct tape solutions to ancient
134
00:07:15,680 --> 00:07:18,000
infrastructure.
Amen to that.
135
00:07:18,800 --> 00:07:22,040
Well, Chris, I think it's safe
to say the F Drive RX isn't just
136
00:07:22,040 --> 00:07:24,920
another box in the rack.
It's a bit of a rethink for how
137
00:07:24,920 --> 00:07:28,600
we approach LED installs,
particularly for teams that
138
00:07:28,600 --> 00:07:30,880
don't want to be up on a ladder
all day or locked in a
139
00:07:30,880 --> 00:07:33,920
maintenance closet.
Yeah, it's proper smart stuff,
140
00:07:34,440 --> 00:07:37,320
and if this is where ET CS
headed, I reckon we'll see other
141
00:07:37,320 --> 00:07:38,880
manufacturers trying to catch
up.
142
00:07:39,560 --> 00:07:43,360
But hey, we'll cover more future
proof gear and stories, good and
143
00:07:43,360 --> 00:07:47,560
bad, in our next episode.
Lacey, always a pleasure diving
144
00:07:47,560 --> 00:07:50,000
in with you.
Same, Chris, thanks for keeping
145
00:07:50,000 --> 00:07:53,200
me honest on the tech terms and
thanks to everyone tuning in.
146
00:07:53,200 --> 00:07:55,600
Catch us next time on Geezers of
Gear Future Tech.
147
00:07:56,080 --> 00:07:59,600
Cheers everyone, take care and
keep the gear in the rack, not
148
00:07:59,600 --> 00:08:01,480
in the ceiling.
See you next episode.
149
00:08:02,640 --> 00:08:09,840
Want to scoop on gear?
Future Tech is here.
150
00:08:10,280 --> 00:08:14,800
Come on, then.
We make the specs so clear.
151
00:08:15,240 --> 00:08:20,200
Oh La La with music to your
ears.
152
00:08:20,400 --> 00:08:22,280
Hey, hey, hey.
Let's go.
153
00:08:22,640 --> 00:08:29,000
New gear vibes, new tech jive
gear hits unite.
154
00:08:29,960 --> 00:08:31,680
We keep it live.